Introduction:
The lab jacketed chemical stirred glass reactor is designed double-level glass. The reaction material is put into the inner, which can be stirred. In the interbed with different cold and hot medium (refrigerating fluid, hot water and hot oil), do some heat circulation and cooling reaction. Under the constant temperature and ordinary pressure, as well as negative pressure, stirring reaction can be done in seal glass reactor, also back-flow, distillation. Etc.
Model
|
HGR-10
|
Volume(L)
|
10
|
Jacket Volume(L)
|
23
|
Reactor Material
|
High Quality Borosilicate Glass 3.3
|
Supporting Frame Material
|
Stainless steel 304 and coated aluminum
|
Neck No.on Cap
|
6
|
Rated Torque
|
550
|
Stirring Power
|
750W (3:1)
|
Rotating Speed
|
6 ~ 600 (customizable)
|
Power Supply
|
110V or 220V or 380V / 50 ~ 66 Hz
|
Discharge
|
PTFE bottom discharge valve
|
Working Temp Range
|
- 80 ~ 250ºC
|
Pressure Range
|
20 mbar to atmosphere
|
Max Jacket Pressure
|
0.5 bar
|
Dimension (mm)
|
450*450*1500
|
Packing:
Our Service:
Pre-Sales Service
* Inquiry and consulting support.
* Sample testing support.
* View our Factory.
After-Sales Service
* Training how to install the machine, training how to use the machine.
* Engineers available to service machinery overseas.
User Demand Analysis
Once the project is confirmed, the product level, processing technology and consulting group are analyzed according to the actual demands of customers so as to provide suitable engineering plans, form a complete production line and calculate the budget.
Engineering Design
We carry out planning and designs on details of engineering plans through introducing internationally advances design conception to provide valuable project technological plans and ensure effective implementation of all steps.
Product Manufacturing
The approved production drawing is the basis for production and manufacturing. All equipment that is not manufactured on the site shall be indentified by our quality responsible person so as to meet the strict stipulations.
Automatic Control Integration
The installation of the system and the whole automatic project meets the GMP standard and FDA standard. According to our years of experience, the installation and process rules will help simplify the starting and commissioning of equipment.
Trial Running and Training
During the equipment commissioning, our engineers will provide guidance on the site and carry out various tests with respect to all performances of the equipment with customers. Approval will be received from users.
Verification Services
To ensure normal production, we can set up maintenance and servicing plans for a single machine, the whole production line or the whole factory and provide equipment maintenance services and offer fittings according to customer requirements.
Certificate:
FAQ:
Q. Payment Term:?
If the total amount below $5000, it should be 100% prepayment. If the total amount above $5000, it should be 50% prepayment; the balance paid before loading.
Q. Delivery Time?
30 days after prepayment received.
Q.Quality guarantee?
One year after shipment excluding the wearing and tearing parts.
Q. Spare parts?
Supply plenty of spare parts when shipping.
Q. Validity of the quotation?
One month.
Q. Installation and training?
Assemble and test the machine before packing.English operation manual offered by us.Overseas installation and training are available if needed.